List of Road Safety Audits Conducted by SEERO

SEERO team has conducted +88 Road Safety Audits (all Stages 1 to 5) in Qatar and Canada. We also conducted road Safety assessments, collision analysis, collision investigation, access management, and safety improvements benefit/cost analysis. We use collision prediction models and collision modification factors to develop road safety benefit/cost analysis, support the geometric design, and develop options. We worked on conceptual, functional, preliminary, and detailed design stages.

Below is a list of the RSAs conducted by our Team.

No.ClientProject NameStageType
1PWA (Qatar)Permanent Access Road for the Al Dhakhira Sewage Treatment WorksStage 4: ConstructionUrban Roads
2AECOM-PWA (Qatar)QS059 – Roads & Infrastructure in Jeryan JenaihatStage 3: Detailed DesignUrban Roads
3AECOM-PWA (Qatar)QS059 – Roads & Infrastructure in Umm GarnStage 3: Detailed DesignUrban Roads
4AECOM-PWA (Qatar)QS060 – Roads & Infrastructure in Umm GarnStage 3: Detailed DesignUrban Roads
5AECOM-PWA (Qatar)QS061 – Wadi Lusail (D01)Stage 3: Detailed DesignUrban Roads
6AECOM-PWA (Qatar)QS061 – Roads & Infrastructure in Wadi Lusail (Revised Design D05)Stage 3: Detailed DesignUrban Roads
7AECOM-PWA (Qatar)Bus Stops/Shelters RSA, Part 2 – 51 Zones, QatarStage 3: Detailed DesignPublic Realm schemes
8PWA (Qatar)DC067-P02: Construction Of Bus And Car Parking For Rail – Package 2 – Al Qassar Park & RideStage 4: ConstructionParking schemes
9PWA (Qatar)DC062-P01: Construction Of Bus And Car Parking Area For Rail – Package 1 – Al Wakra Park & RideStage 4: ConstructionParking schemes
10PWA (Qatar)DC063-P03: Construction Of Bus And Car Parking Area For Rail – Package 3 – Education City Park & RideStage 4: ConstructionParking schemes
11PWA (Qatar)DC066-P04: Construction Of Bus And Car Parking Area For Rail – Package 4 – Lusail Park & RideStage 4: ConstructionParking schemes
12AECOM-PWA (Qatar)Bus Stops/Shelters RSA, Part 1 – 35 Zones, QatarStage 3: Detailed DesignPublic Realm schemes
13AECOM-PWA (Qatar)QS058 – Roads & Infrastructure in Isghawa & Al-ThemaidStage 1: Concept DesignUrban Roads
14AECOM-PWA (Qatar)QS059 – Roads & Infrastructure in Jeryan JenaihatStage 1: Concept DesignUrban Roads
15AECOM-PWA (Qatar)QS060 – Roads & Infrastructure in Umm GarnStage 1: Concept DesignUrban Roads
16AECOM-PWA (Qatar)QS061 – Roads & Infrastructure in Wadi LusailStage 1: Concept DesignUrban Roads
17PARSONS-PWA (Qatar)Immigration interchange roundabout and 22nd February StreetStage 4: ConstructionMajor Interchanges
18BC MoTI, CanadaRoad Safety Audit focused on Active Transportation for Mountain Highway Interchange at Highway 1, MoTI, North Vancouver, BC, CanadaThematicCycle Routes or Pedestrian Facilities
19Chilliwack, BCExpert Witness for a vehicular collision in the City of Chilliwack, BC, CanadaStage 6: Existing Road NetworkUrban Roads
20MoT (Qatar)Tanbak Hospital Development TIA RSAStage 1: Concept DesignParking schemes
21PWA (Qatar)P007-C-5-P1- Albustan Street South TTM – Al Waab Interchange Eastbound Work ZonesMajor Interchanges
22PWA (Qatar)P007-C-5-P1- Albustan Street South TTM – Al Waab Interchange Westbound Work ZonesMajor Interchanges
23MoT (Qatar)Al Mansoura Mixed-Use Development RSAStage 1: Concept DesignParking schemes
24PWA (Qatar)TTM of Al Rufaa Street and Wadi Al Salamiya Street in the west of Al Kharaitiyat Interchange (N8) – – Post Construction/TTM (Beneficial Use)Stage 4: ConstructionWork zones & TTM Diversion routes
25PWA (Qatar)P059 – North Road – Service Road in the west of Km 3-6 & east of Km 10-14Stage 4: ConstructionMajor Interchanges
26MoT (Qatar)Site 1 – Msheureb Bus StationStage 1: Concept DesignParking schemes
27MoT (Qatar)Site 2 – Al Sudan Bus StationStage 1: Concept DesignParking schemes
28MoT (Qatar)Site 3 – Lusail Bus Station & Park & RideStage 1: Concept DesignParking schemes
29MoT (Qatar)Site 4 – Gharrafa Bus StationStage 1: Concept DesignParking schemes
30MoT (Qatar)Site 5 – Oqba Bin Nafie Bus StationStage 1: Concept DesignParking schemes
31MoT (Qatar)Site 6 – Education City Bus StationStage 1: Concept DesignParking schemes
32MoT (Qatar)Site 7 – Al Thumama Bus StationStage 1: Concept DesignParking schemes
33MoT (Qatar)Site 8 – Al Qassar Bus Station & Park & RideStage 1: Concept DesignParking schemes
34MoT (Qatar)Site 9 – West Bay Central Bus StationStage 1: Concept DesignParking schemes
35MoT (Qatar)Site 10 – Al Wakra Bus Station & DepotStage 1: Concept DesignParking schemes
36MoT (Qatar)Site 11 – Abo Sidra Bus DepotStage 1: Concept DesignParking schemes
37MoT (Qatar)Site 12 – Al Themaid Bus DepotStage 1: Concept DesignParking schemes
38MoT (Qatar)Site 13 – Lusail Bus DepotStage 1: Concept DesignParking schemes
39MoT (Qatar)Site 15 – Equestrian Club Park & RideStage 1: Concept DesignParking schemes
40MoT (Qatar)Site 16 – West Bay Bus/Ferry TerminalStage 1: Concept DesignParking schemes
41MoT (Qatar)Site 17 – Industrial Area Bus StationStage 1: Concept DesignParking schemes
42MoT (Qatar)Site 18 – Al Ghanim Bus Station Stage 1: Concept DesignParking schemes
43PWA (Qatar)P007-C5-P1 – AL BUSTAN STREET SOUTHStage 2: Preliminary DesignHigh Speeds
44PWA (Qatar)P007-C5-P1 – AL BUSTAN STREET SOUTHStage 3: Detailed DesignHigh Speeds
45PWA (Qatar)West Entrance – Al Diwan & Salwa Road Temporary Diversion Plan, Phase 2Stage 3: Detailed DesignWork zones & TTM Diversion routes
46PWA (Qatar)P011 – G RING ROAD – AL WUKAIR TTMStage 4: ConstructionWork zones & TTM Diversion routes
47PWA (Qatar)P015 – Al Wakrah Bypass – IC11 – North to East RampStage 4: ConstructionHigh Speeds
48PWA (Qatar)P015 – Al Wakrah Bypass – IC11 – West South RampStage 4: ConstructionHigh Speeds
49PWA (Qatar)Madinat Mawater Phase-02
Concept-Design 
Stage 1: Concept DesignUrban Roads
50PWA (Qatar)P015 – Al Wakrah By-pass – IC11A – U TurnStage 4: ConstructionMajor Interchanges
51PWA (Qatar)P015 – Al Wakrah By-pass – IC10 – North to East Ramp – Beneficial use openingStage 4: ConstructionMajor Interchanges
52PWA (Qatar)P015 – Al Wakrah By-pass – IC11 – Loops & Ramps – Beneficial Use OpeningStage 3: Detailed DesignHigh Speeds
53PWA (Qatar)QS016 P02: CONSTRUCTION OF BY-PASS FROM RAWDAT RASHED VILLAGE TO UMM GARN (IA 14/15/ C 031 ST)Stage 4: ConstructionHigh Speeds
54PWA (Qatar)P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 – CONNECTION RAMPS TO P015Stage 4: ConstructionHigh Speeds
55PWA (Qatar)P015 – Al Wakrah By-pass – Mainline – Beneficial useStage 4: ConstructionHigh Speeds
56PWA (Qatar)CONSTRUCTION AND UPGRADE OF NORTH/SOUTH LINK (P008-C2) – TTM WESTBOUNDStage 4: ConstructionHigh Speeds
57PWA (Qatar)TRAFFIC DIVERSION PLAN PHASE 8-19 PEARL JUNCTION – P003Stage 4: ConstructionWork zones & TTM Diversion routes
58PWA (Qatar)TRAFFIC DIVERSION PLAN PHASE 8-19 PEARL JUNCTION – P003Stage 3: Detailed DesignWork zones & TTM Diversion routes
59PWA (Qatar)P015 – AL WAKRAH BYPASS – BENEFICIAL USE – IC10, IC11A and IC11Stage 3: Detailed DesignHigh Speeds
60PWA (Qatar)P015 – AL WAKRAH BYPASS – BENEFICIAL USE – IC10, IC11A and IC11Stage 4: ConstructionHigh Speeds
61PWA (Qatar)HGH Trauma and Emergency Expansion – Concept-DesignStage 1: Concept DesignParking schemes
62PWA (Qatar)QN006 – AL KHOR STREET EXTENSION: UMM GRAIN TO ABA ERBAYYATStage 3: Detailed DesignHigh Speeds
63PWA (Qatar)P015 PHASE -4 PARTIAL ROAD OPENING / TRAFFIC DIVERSION PLAN FOR AL WAKRAH BYPASS (MAIN LINE)Stage 3: Detailed DesignWork zones & TTM Diversion routes
64PWA (Qatar)TRAFFIC DIVERSION PLAN – P003- AL WAHDA FLYOVER OPENING | PRE-OPENING  Stage 4: ConstructionWork zones & TTM Diversion routes
65PWA (Qatar)Construction And Upgrading Of Infrastructure Of Al Muntazah Street Extension And Construction Of Ashghal Road Behind Barwa Commercial Avenue (P012)Stage 3: Detailed DesignUrban Roads
66PWA (Qatar)P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 TEMPORARY LOOPS TTMStage 4: ConstructionWork zones & TTM Diversion routes
67PWA (Qatar)P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 – MAIN LINEStage 4: ConstructionHigh Speeds
68PWA (Qatar)AL WAKRAH BY-PASS (P015), TEMPORARY TRAFFIC DIVERSION IC12 (PHASE 3)Stage 3: Detailed DesignWork zones & TTM Diversion routes
69PWA (Qatar)CONSTRUCTION AND UPGRADE OF NORTH/SOUTH LINK (P008-C2) F-Ring TDPStage 3: Detailed DesignWork zones & TTM Diversion routes
70MoT (Qatar)/PWA (Qatar)ARIANE CITY DEVELOPMENT, Concept DesignStage 1: Concept DesignParking schemes
71PWA (Qatar)Construction and Upgrading of Infrastructure of Al Muntazah Street Extension and Construction of Ashghal Road Behind Barwa Commercial Avenue (P012)Stage 3: Detailed DesignUrban Roads
72PWA (Qatar)TRAFFIC DIVERSION PLAN – P-003-LUSAIL EXPRESSWAY PROJECTStage 3: Detailed DesignWork zones & TTM Diversion routes
73PWA (Qatar)TRAFFIC DIVERSION PLAN – P-003-LUSAIL EXPRESSWAY PROJECTStage 4: ConstructionWork zones & TTM Diversion routes
74PWA (Qatar)TRAFFIC DIVERSION PLAN – P003- AL WAHDA FLYOVER OPENINGStage 3: Detailed DesignWork zones & TTM Diversion routes
75PWA (Qatar)P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 TEMPORARY TRAFFIC MANAGEMENT PLANStage 4: ConstructionWork zones & TTM Diversion routes
76PWA (Qatar)P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 – AL WUKAIR TTMStage 4: ConstructionWork zones & TTM Diversion routes
77PWA (Qatar)Design & Construct Services Road Enhancement To  North Road Corridor (P059) (IA/11-12/C/159/G) – N8Stage 4: ConstructionHigh Speeds
78PWA (Qatar)Design & Construct Services Road Enhancement To  North Road Corridor  (P059) (IA/11-12/C/159/G) – N24Stage 4: ConstructionHigh Speeds
79PWA (Qatar)Design & Construct Services Road Enhancement To  North Road Corridor (P059) (IA/11-12/C/159/G) – N12 Ramp A- Service RdStage 4: ConstructionMajor Interchanges
80PWA (Qatar)Design & Construct Services Road Enhancement To  North Road Corridor (P059) (IA/11-12/C/159/G) – N12 Ramp DStage 4: ConstructionHigh Speeds
81PWA (Qatar)Design & Construct Services Road Enhancement To  North Road Corridor (P059) (IA/11-12/C/159/G) – N66Stage 4: ConstructionHigh Speeds
82MoT (Qatar)/PWA (Qatar)Circulation & Parking Audit Report (Rev-3) For (Revised Master Plan for the South Plaza Area at the Katara Project)Stage 3: Detailed DesignPublic Realm schemes
83PWA (Qatar)New Orbital Highway & Truck Route Contract 3 Orbital Highway: Mesaieed To Salwa Road (Orbital Beneficial Use TMP)Stage 2: Preliminary DesignHigh Speeds
84PWA (Qatar)P010-WUKAIR BYPASS (625 m Link between P010 East/West Corridor and P023-C1-Wukair Bypass)Stage 3: Detailed DesignHigh Speeds
85PWA (Qatar)QS016 – Phase 2 Roads and Infrastructure for Rawdat Rashed By-passStage 4: ConstructionUrban Roads
86PWA (Qatar)Jery Al Samour Development – Industrial local roads and site development plans connected with PWA (Qatar) surrounding roads. (2 km)Stage 3: Detailed DesignUrban Roads
87PWA (Qatar)Temporary Traffic Management for P07 Rayyan Road Upgrade – Phase 3 (1.1 km) Stage 4: ConstructionWork zones & TTM Diversion routes
88PWA (Qatar)Lusail Expressway Tunnel LinkStage 4: ConstructionHigh Speeds