SEERO team has conducted +88 Road Safety Audits (all Stages 1 to 5) in Qatar and Canada. We also conducted road Safety assessments, collision analysis, collision investigation, access management, and safety improvements benefit/cost analysis. We use collision prediction models and collision modification factors to develop road safety benefit/cost analysis, support the geometric design, and develop options. We worked on conceptual, functional, preliminary, and detailed design stages.
Below is a list of the RSAs conducted by our Team.
No. | Client | Project Name | Stage | Type |
1 | PWA (Qatar) | Permanent Access Road for the Al Dhakhira Sewage Treatment Works | Stage 4: Construction | Urban Roads |
2 | AECOM-PWA (Qatar) | QS059 – Roads & Infrastructure in Jeryan Jenaihat | Stage 3: Detailed Design | Urban Roads |
3 | AECOM-PWA (Qatar) | QS059 – Roads & Infrastructure in Umm Garn | Stage 3: Detailed Design | Urban Roads |
4 | AECOM-PWA (Qatar) | QS060 – Roads & Infrastructure in Umm Garn | Stage 3: Detailed Design | Urban Roads |
5 | AECOM-PWA (Qatar) | QS061 – Wadi Lusail (D01) | Stage 3: Detailed Design | Urban Roads |
6 | AECOM-PWA (Qatar) | QS061 – Roads & Infrastructure in Wadi Lusail (Revised Design D05) | Stage 3: Detailed Design | Urban Roads |
7 | AECOM-PWA (Qatar) | Bus Stops/Shelters RSA, Part 2 – 51 Zones, Qatar | Stage 3: Detailed Design | Public Realm schemes |
8 | PWA (Qatar) | DC067-P02: Construction Of Bus And Car Parking For Rail – Package 2 – Al Qassar Park & Ride | Stage 4: Construction | Parking schemes |
9 | PWA (Qatar) | DC062-P01: Construction Of Bus And Car Parking Area For Rail – Package 1 – Al Wakra Park & Ride | Stage 4: Construction | Parking schemes |
10 | PWA (Qatar) | DC063-P03: Construction Of Bus And Car Parking Area For Rail – Package 3 – Education City Park & Ride | Stage 4: Construction | Parking schemes |
11 | PWA (Qatar) | DC066-P04: Construction Of Bus And Car Parking Area For Rail – Package 4 – Lusail Park & Ride | Stage 4: Construction | Parking schemes |
12 | AECOM-PWA (Qatar) | Bus Stops/Shelters RSA, Part 1 – 35 Zones, Qatar | Stage 3: Detailed Design | Public Realm schemes |
13 | AECOM-PWA (Qatar) | QS058 – Roads & Infrastructure in Isghawa & Al-Themaid | Stage 1: Concept Design | Urban Roads |
14 | AECOM-PWA (Qatar) | QS059 – Roads & Infrastructure in Jeryan Jenaihat | Stage 1: Concept Design | Urban Roads |
15 | AECOM-PWA (Qatar) | QS060 – Roads & Infrastructure in Umm Garn | Stage 1: Concept Design | Urban Roads |
16 | AECOM-PWA (Qatar) | QS061 – Roads & Infrastructure in Wadi Lusail | Stage 1: Concept Design | Urban Roads |
17 | PARSONS-PWA (Qatar) | Immigration interchange roundabout and 22nd February Street | Stage 4: Construction | Major Interchanges |
18 | BC MoTI, Canada | Road Safety Audit focused on Active Transportation for Mountain Highway Interchange at Highway 1, MoTI, North Vancouver, BC, Canada | Thematic | Cycle Routes or Pedestrian Facilities |
19 | Chilliwack, BC | Expert Witness for a vehicular collision in the City of Chilliwack, BC, Canada | Stage 6: Existing Road Network | Urban Roads |
20 | MoT (Qatar) | Tanbak Hospital Development TIA RSA | Stage 1: Concept Design | Parking schemes |
21 | PWA (Qatar) | P007-C-5-P1- Albustan Street South TTM – Al Waab Interchange Eastbound | Work Zones | Major Interchanges |
22 | PWA (Qatar) | P007-C-5-P1- Albustan Street South TTM – Al Waab Interchange Westbound | Work Zones | Major Interchanges |
23 | MoT (Qatar) | Al Mansoura Mixed-Use Development RSA | Stage 1: Concept Design | Parking schemes |
24 | PWA (Qatar) | TTM of Al Rufaa Street and Wadi Al Salamiya Street in the west of Al Kharaitiyat Interchange (N8) – – Post Construction/TTM (Beneficial Use) | Stage 4: Construction | Work zones & TTM Diversion routes |
25 | PWA (Qatar) | P059 – North Road – Service Road in the west of Km 3-6 & east of Km 10-14 | Stage 4: Construction | Major Interchanges |
26 | MoT (Qatar) | Site 1 – Msheureb Bus Station | Stage 1: Concept Design | Parking schemes |
27 | MoT (Qatar) | Site 2 – Al Sudan Bus Station | Stage 1: Concept Design | Parking schemes |
28 | MoT (Qatar) | Site 3 – Lusail Bus Station & Park & Ride | Stage 1: Concept Design | Parking schemes |
29 | MoT (Qatar) | Site 4 – Gharrafa Bus Station | Stage 1: Concept Design | Parking schemes |
30 | MoT (Qatar) | Site 5 – Oqba Bin Nafie Bus Station | Stage 1: Concept Design | Parking schemes |
31 | MoT (Qatar) | Site 6 – Education City Bus Station | Stage 1: Concept Design | Parking schemes |
32 | MoT (Qatar) | Site 7 – Al Thumama Bus Station | Stage 1: Concept Design | Parking schemes |
33 | MoT (Qatar) | Site 8 – Al Qassar Bus Station & Park & Ride | Stage 1: Concept Design | Parking schemes |
34 | MoT (Qatar) | Site 9 – West Bay Central Bus Station | Stage 1: Concept Design | Parking schemes |
35 | MoT (Qatar) | Site 10 – Al Wakra Bus Station & Depot | Stage 1: Concept Design | Parking schemes |
36 | MoT (Qatar) | Site 11 – Abo Sidra Bus Depot | Stage 1: Concept Design | Parking schemes |
37 | MoT (Qatar) | Site 12 – Al Themaid Bus Depot | Stage 1: Concept Design | Parking schemes |
38 | MoT (Qatar) | Site 13 – Lusail Bus Depot | Stage 1: Concept Design | Parking schemes |
39 | MoT (Qatar) | Site 15 – Equestrian Club Park & Ride | Stage 1: Concept Design | Parking schemes |
40 | MoT (Qatar) | Site 16 – West Bay Bus/Ferry Terminal | Stage 1: Concept Design | Parking schemes |
41 | MoT (Qatar) | Site 17 – Industrial Area Bus Station | Stage 1: Concept Design | Parking schemes |
42 | MoT (Qatar) | Site 18 – Al Ghanim Bus Station | Stage 1: Concept Design | Parking schemes |
43 | PWA (Qatar) | P007-C5-P1 – AL BUSTAN STREET SOUTH | Stage 2: Preliminary Design | High Speeds |
44 | PWA (Qatar) | P007-C5-P1 – AL BUSTAN STREET SOUTH | Stage 3: Detailed Design | High Speeds |
45 | PWA (Qatar) | West Entrance – Al Diwan & Salwa Road Temporary Diversion Plan, Phase 2 | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
46 | PWA (Qatar) | P011 – G RING ROAD – AL WUKAIR TTM | Stage 4: Construction | Work zones & TTM Diversion routes |
47 | PWA (Qatar) | P015 – Al Wakrah Bypass – IC11 – North to East Ramp | Stage 4: Construction | High Speeds |
48 | PWA (Qatar) | P015 – Al Wakrah Bypass – IC11 – West South Ramp | Stage 4: Construction | High Speeds |
49 | PWA (Qatar) | Madinat Mawater Phase-02 Concept-Design | Stage 1: Concept Design | Urban Roads |
50 | PWA (Qatar) | P015 – Al Wakrah By-pass – IC11A – U Turn | Stage 4: Construction | Major Interchanges |
51 | PWA (Qatar) | P015 – Al Wakrah By-pass – IC10 – North to East Ramp – Beneficial use opening | Stage 4: Construction | Major Interchanges |
52 | PWA (Qatar) | P015 – Al Wakrah By-pass – IC11 – Loops & Ramps – Beneficial Use Opening | Stage 3: Detailed Design | High Speeds |
53 | PWA (Qatar) | QS016 P02: CONSTRUCTION OF BY-PASS FROM RAWDAT RASHED VILLAGE TO UMM GARN (IA 14/15/ C 031 ST) | Stage 4: Construction | High Speeds |
54 | PWA (Qatar) | P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 – CONNECTION RAMPS TO P015 | Stage 4: Construction | High Speeds |
55 | PWA (Qatar) | P015 – Al Wakrah By-pass – Mainline – Beneficial use | Stage 4: Construction | High Speeds |
56 | PWA (Qatar) | CONSTRUCTION AND UPGRADE OF NORTH/SOUTH LINK (P008-C2) – TTM WESTBOUND | Stage 4: Construction | High Speeds |
57 | PWA (Qatar) | TRAFFIC DIVERSION PLAN PHASE 8-19 PEARL JUNCTION – P003 | Stage 4: Construction | Work zones & TTM Diversion routes |
58 | PWA (Qatar) | TRAFFIC DIVERSION PLAN PHASE 8-19 PEARL JUNCTION – P003 | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
59 | PWA (Qatar) | P015 – AL WAKRAH BYPASS – BENEFICIAL USE – IC10, IC11A and IC11 | Stage 3: Detailed Design | High Speeds |
60 | PWA (Qatar) | P015 – AL WAKRAH BYPASS – BENEFICIAL USE – IC10, IC11A and IC11 | Stage 4: Construction | High Speeds |
61 | PWA (Qatar) | HGH Trauma and Emergency Expansion – Concept-Design | Stage 1: Concept Design | Parking schemes |
62 | PWA (Qatar) | QN006 – AL KHOR STREET EXTENSION: UMM GRAIN TO ABA ERBAYYAT | Stage 3: Detailed Design | High Speeds |
63 | PWA (Qatar) | P015 PHASE -4 PARTIAL ROAD OPENING / TRAFFIC DIVERSION PLAN FOR AL WAKRAH BYPASS (MAIN LINE) | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
64 | PWA (Qatar) | TRAFFIC DIVERSION PLAN – P003- AL WAHDA FLYOVER OPENING | PRE-OPENING | Stage 4: Construction | Work zones & TTM Diversion routes |
65 | PWA (Qatar) | Construction And Upgrading Of Infrastructure Of Al Muntazah Street Extension And Construction Of Ashghal Road Behind Barwa Commercial Avenue (P012) | Stage 3: Detailed Design | Urban Roads |
66 | PWA (Qatar) | P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 TEMPORARY LOOPS TTM | Stage 4: Construction | Work zones & TTM Diversion routes |
67 | PWA (Qatar) | P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 – MAIN LINE | Stage 4: Construction | High Speeds |
68 | PWA (Qatar) | AL WAKRAH BY-PASS (P015), TEMPORARY TRAFFIC DIVERSION IC12 (PHASE 3) | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
69 | PWA (Qatar) | CONSTRUCTION AND UPGRADE OF NORTH/SOUTH LINK (P008-C2) F-Ring TDP | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
70 | MoT (Qatar)/PWA (Qatar) | ARIANE CITY DEVELOPMENT, Concept Design | Stage 1: Concept Design | Parking schemes |
71 | PWA (Qatar) | Construction and Upgrading of Infrastructure of Al Muntazah Street Extension and Construction of Ashghal Road Behind Barwa Commercial Avenue (P012) | Stage 3: Detailed Design | Urban Roads |
72 | PWA (Qatar) | TRAFFIC DIVERSION PLAN – P-003-LUSAIL EXPRESSWAY PROJECT | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
73 | PWA (Qatar) | TRAFFIC DIVERSION PLAN – P-003-LUSAIL EXPRESSWAY PROJECT | Stage 4: Construction | Work zones & TTM Diversion routes |
74 | PWA (Qatar) | TRAFFIC DIVERSION PLAN – P003- AL WAHDA FLYOVER OPENING | Stage 3: Detailed Design | Work zones & TTM Diversion routes |
75 | PWA (Qatar) | P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 TEMPORARY TRAFFIC MANAGEMENT PLAN | Stage 4: Construction | Work zones & TTM Diversion routes |
76 | PWA (Qatar) | P011 – CONSTRUCTION OF EAST CORRIDOR PACKAGE 2 – AL WUKAIR TTM | Stage 4: Construction | Work zones & TTM Diversion routes |
77 | PWA (Qatar) | Design & Construct Services Road Enhancement To North Road Corridor (P059) (IA/11-12/C/159/G) – N8 | Stage 4: Construction | High Speeds |
78 | PWA (Qatar) | Design & Construct Services Road Enhancement To North Road Corridor (P059) (IA/11-12/C/159/G) – N24 | Stage 4: Construction | High Speeds |
79 | PWA (Qatar) | Design & Construct Services Road Enhancement To North Road Corridor (P059) (IA/11-12/C/159/G) – N12 Ramp A- Service Rd | Stage 4: Construction | Major Interchanges |
80 | PWA (Qatar) | Design & Construct Services Road Enhancement To North Road Corridor (P059) (IA/11-12/C/159/G) – N12 Ramp D | Stage 4: Construction | High Speeds |
81 | PWA (Qatar) | Design & Construct Services Road Enhancement To North Road Corridor (P059) (IA/11-12/C/159/G) – N66 | Stage 4: Construction | High Speeds |
82 | MoT (Qatar)/PWA (Qatar) | Circulation & Parking Audit Report (Rev-3) For (Revised Master Plan for the South Plaza Area at the Katara Project) | Stage 3: Detailed Design | Public Realm schemes |
83 | PWA (Qatar) | New Orbital Highway & Truck Route Contract 3 Orbital Highway: Mesaieed To Salwa Road (Orbital Beneficial Use TMP) | Stage 2: Preliminary Design | High Speeds |
84 | PWA (Qatar) | P010-WUKAIR BYPASS (625 m Link between P010 East/West Corridor and P023-C1-Wukair Bypass) | Stage 3: Detailed Design | High Speeds |
85 | PWA (Qatar) | QS016 – Phase 2 Roads and Infrastructure for Rawdat Rashed By-pass | Stage 4: Construction | Urban Roads |
86 | PWA (Qatar) | Jery Al Samour Development – Industrial local roads and site development plans connected with PWA (Qatar) surrounding roads. (2 km) | Stage 3: Detailed Design | Urban Roads |
87 | PWA (Qatar) | Temporary Traffic Management for P07 Rayyan Road Upgrade – Phase 3 (1.1 km) | Stage 4: Construction | Work zones & TTM Diversion routes |
88 | PWA (Qatar) | Lusail Expressway Tunnel Link | Stage 4: Construction | High Speeds |