This project titled “design and build of bus stop shelters and associated infrastructure” aims to construct and upgrade around 2700 bus stops. The stops will have either air-conditioned shelter, non-air-conditioned shelters and stops with only bus stop sign pole. All three structures will include information screens that will provide the users with important information regarding the estimated buses arrival time, routes and destinations.
Seero scope of work was to validate exact location of the bus stops in Qatar and provide underground utilities design drawings for construction activities. The utilities that are included in this scope are LV, HV&EHV, MV, Ooredoo, QAF, potable water, storm water drainage, foul sewer and TSE (if any). The topographical survey was provided by AECOM to Seero for each location. Seero team studied each location and determined how to coordinate the utilities with the bus stop to avoide clashs. The only connection with the underground utilities to the bus stops was the electrical power.
The scope covered only the bus stop location and 100m before and after the stop except the LV cables which will be considered from the nearest source.
Seero produced design drawings that indicates the infrastructure utilities required at each location.
Infrastructure utilities were as per bus infrastructure guidelines and the approved typical bus stop layouts by MOTC, QHDM and QTCM.