Seero provided all the design stages of the project items, the scope included the following:
- Submitted the full package of design stages for concept, schematic, and detailed design.
- Completed all IFC drawings and submitted them for approval from the consultant for all the disciplines.
- Addressed all comments raised on the submitted IFC to the consultant and closed all comments for approval.
- Ensured a full coordination in the IFC drawings between all disciplines and other contractors as-built work.
- Provided all required design calculations reports and submitted them for approval.
- Conducted design verification on structural elements.
- Provided technical support for Contractors NCRs.
- RFI responses.