The project requires to re-study the new optimized trench width using InfoWorks ICM and propose the required improvement of the surface water network, taking into consideration the existing site conditions and Public Works Authority (PWA)’s comments.
Seero Studied the surface water system design using InfoWorks ICM that included the following: