TSP 31 project is part of the FIFA compliant training sites that is planned to be constructed near the existing Doha Golf Course. The Supreme Committee for Delivery & Legacy (SC) has awarded the contracts to build these training sites to two contractors Nakheel Landscapes and Gulf Contracting. All member associations participating in the first ever FIFA World Cup™ in the Arab World will be provided with team base training camps for their accommodation and training needs during the tournament. Each team base camp will be paired with training sites for the exclusive use of each participating nation. Some of the chosen locations include the vicinities of Aspire Zone, Qatar University, Doha Golf Course, Al Sailiya and the West Bay area, with public sports grounds and parks included in the legacy planning for the facilities.
Seero studied and determined the maximum flood level at the locations where the runoff streams intersect with the proposed roads in order to raise the road embankment over the flood level to provide flood protection.