The Workshop located in industrial area, is a metal workshop built on 15,402 square meters, and carries out manufacturing functions, which require full MEP services. The Workshop is composed of round and first floor, the building is divided into main workshop hall and the office buildings occupying ground and first floors.
Seero’s Team have worked closely with the Client ,contractors & sub contractors in order to ensure that the design met all client, Safety & international requirements & regulations ( MMUP regulations ).
Seero scope was to Design the MEP Detailed Design Package and develop IFC drawings for all the services involved along with BOQ & Specs.
The scope includes :