The project comprises redesigning of some of the existing roads aiming to provide better riding quality and proper pedestrians connectivity in addition to improved stormwater management in 5 zones in the State of Qatar namely, 14, 15, 16, 24 and 25. The improvements extend through almost 15 km of different urban road classes (Local – Arterial) within Doha City. The mentioned zones are considered one of the oldest in Qatar, therefore the improvements considered all the existing super and infrastructures to deliver an optimal design with minimal adjustments to the site.
Seero carried out Detailed Road Design for multiple roads within zones 24 ,16 ,15 ,14 and 25 in Doha city. Based on the topographic survey, the roads are designed to respect the proposed road utilities. Seero team studied the existing road elevation and proposed a complete detailed design for the road profiles and typical cross sections and pavement layers as per QHDM, PWA and QCS standards. The coverage levels of the proposed surface water manholes and gullies were also studied and presented in the drawings. Seero also advised the client by the location and spacing of road gullies that had to be changed.